Updated Aug-2022 Test Engine to Practice AD01 Test Questions [Q53-Q77]

Rate this post

Updated Aug-2022 Test Engine to Practice AD01 Test Questions

AD01 Real Exam Questions Test Engine Dumps Training With 102 Questions

For more info visit:

AD01 Exam Reference

Certification Path

The Blue Prism Accredited Developer certification is a foundational exam path and includes only one AD01 certification exam.

 

NO.53 When building a solution to use Tags within a Work Queue, which of the following statements is correct true?

 
 
 

NO.54 Consider the following flow in an object:

Which of the following statements are true?

 
 
 
 

NO.55 Examine the following process flow:

The Orders Collection contains the following data

The Saved Quantity Data Item is configured as a number with the initial value 0.
The Loop Orders stage is configured to loop though the Orders collection.
The Get Quantity stage is configured as follows:

What will the data item Saved Quantity contain after the execution of the page?

 
 
 
 

NO.56 Look at this flow diagram from the Main Page of a process in Process Studio:

Thinking about the standard Blue Prism Process Templates, what is wrong with how this Main Page is handling exceptions?

 
 
 
 
 

NO.57 Examine the process flow:

The Process is intended to attempt to perform the processing in the recover block, Block 3, a maximum of three times before throwing an exception.
Data Item “Attempts” is a number data item with an initial value of 0
Data Item “Max Attempts” is a number data item with an initial value of 3 The ‘Increment Attempts’ calculation stage outputs a result to the “Attempts” data item To enable this to work correctly, what is the correct expressions for the ‘Increment Attempts’ calculation stage?

 
 
 
 

NO.58 When automating a Windows application what type of stage is configured to perform a Global Send Key Events?

 
 
 
 

NO.59 Consider the following process flow from a sub-page of a process:

What is the problem with this sub-page flow?

 
 
 
 

NO.60 How can a session variable value be updated when a process is running? (select all that apply)

 
 
 
 

NO.61 A business object needs to use a Global Send Keys stage to populate the User Name field in an application entitled Workflow. The application is in focus and cursor is in the User Name field. In order to configure the Global Send Keys, which element needs to be placed in the Element field of the stage below?

 
 
 
 

NO.62 When a process is running in Control Room which of the following functions within the process can be accessed from Control Room to request the process to stop?

 
 
 
 
 
 

NO.63 Consider the following process flow:

Decision JA” properties are:

Decision “B” properties are.

Decision “C” properties are

What will happen when the process runs?

 
 
 
 

NO.64 Study the process flow below:

The outputs for the Get Next Case are configured below:

A)

B)

C)

D)

 
 
 
 

NO.65 The Saved Quantity Data Item is configured as a number with the initial value 0.
The Loop Orders stage is configured to loop though the Orders collection.
The Get Quantity stage is configured as follows:

What will the data item Saved Quantity contain after the execution of the page?

 
 
 
 

NO.66 Consider the following flow in an object:

Which of the following statement is true?

 
 
 
 

NO.67 How many End Stages can a sub-page in a Process have?

 
 
 
 

NO.68 A business object needs to use a Global Send Keys stage to populate the User Name field in an application entitled Workflow. The application is in focus and cursor is in the User Name field. In order to configure the Global Send Keys, which element needs to be placed in the Element field of the stage below?

 
 
 
 

NO.69 The Order System application has been successfully launched and Blue Prism has navigated the application to the following screen:

There is a requirement to ensure this screen is in focus before any further interfacing is done with the screen. Which is the correct configuration to ensure the New Order screen is in focus?
A:

B:

C:

D:

 
 
 
 

NO.70 If you change a session variable when will the new value be available to the process?

 
 
 
 

NO.71 Study the following page in a process:


Calculation stages will write A, B or C to the Output value data item.
What will be the outcome after the page has run?

 
 
 
 

NO.72 The Work Queue “Customer Onboarding” has a number of Pending Items which may be tagged as
“Domestic”, “Retail” or “Business”. There is also a tag for the 8 digit product code formatted as “Product Code: {product code}” e.g. Product Code: CA123456.
What is the correct configuration to get the next item from the queue that:
Isn’t applying for a loan product i.e. Product Code doesn’t begin with “LN” And

Is a domestic customer

 
 
 
 

NO.73 The main menu of the application Centrix Data Solutions consists of a series of buttons, as displayed below:

When the buttons spied, the element attributes are all identical, with the exception of the Window Text attribute which differs. The Window Text values for each of the buttons displayed above, are ‘HOME’, ‘ORDERS’, ‘CUSTOMER’, ‘STOCK’, ‘INBOX’, ‘SETTINGS’ and ‘EXIT’.
It is described to use a single Dynamic element to interact with each of the menu buttons. The Dynamic button element has been spied and has the following attributes set:

A Navigate stage has been configured to press the ORDERS button:

To ensure the Navigate stage can click the ORDERS button successfully, what additional configuration is required in the Navigate stage?

 
 
 
 

NO.74 Which of the following flows can you not create in Blue Prism? (Choose two.)

 
 
 
 

NO.75 Consider the following diagram from an object studio action:

What is the problem with this flow?

 
 
 
 

NO.76 Which of the following statements regarding the use of Work Queues are correct? (select 2 responses)

 
 
 
 

NO.77 Study the following configuration





Which of the following statements is correct?

 
 
 
 

Introduction

Blue prism has meticulously designed the certification outline that mainly focuses on the below areas.

  • Life cycle Orientation
  • Developer Best Practice
  • Exception Handling Guide
  • Work Queues Guide
  • Object Layer Design

Most of the Blue prism certification exam questions for the developer exam (AD01) are based on the above topics. However, apart from the above sections, candidates need to have a fair idea on the topics like

  • Object development and application modeling
  • How to debug process solutions
  • Correct use of session, data types, and environment variables
  • Session management and control Room resource
  • Internal calculation functions of Blue Prism

It is advised from Blue prism that the candidate must complete Blue prism developer Foundation training along with self-assessment to get the proper idea on Blue prism accreditation questions and answers for successful completion of the certification exam

 

AD01 Actual Questions Answers PDF 100% Cover Real Exam Questions: https://www.dumpstests.com/AD01-latest-test-dumps.html

Related Links: www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

No Responses

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

Related Certifications
Recent Comments