NEW QUESTION 36
How long should records of inspections be maintained?

 
 
 
 

NEW QUESTION 37
For flammable and combustible liquids, what is the number of control areas allowed on the 2nd floor above grade level of a building?

 
 
 
 

NEW QUESTION 38
What is the maximum occupant load for a conference room with a total area of 900 ft² (84 m²)?

 
 
 
 

NEW QUESTION 39
What is the required interior finish for the exits in a new educational building not protected by an automatic sprinkler system?

 
 
 
 

NEW QUESTION 40
Sprinkler systems in garages that are used only for the parking of vehicles shall be designed for which of the following hazard classifications?

 
 
 
 

NEW QUESTION 41
What is the minimum diameter allowed for piping serving fire hydrants on private fire service mains?

 
 
 
 

NEW QUESTION 42
How much clear space shall be maintained around the circumference of a fire hydrant (except as otherwise required or approved)?

 
 
 
 

NEW QUESTION 43
What is the maximum length of dead-end corridors in new mercantile occupancies protected by a supervised automatic sprinkler system?

 
 
 
 

NEW QUESTION 44
A high-hazard occupancy less than 200 ft² (18.6 m) in size, and with an occupant load not exceeding three, requires a second means of egress when the travel distance is greater than:

 
 
 
 

NEW QUESTION 45
What is the color of a heat-sensing fire detector with a temperature classification of extra high?

 
 
 
 

NEW QUESTION 46
Fire extinguishers having a gross weight not exceeding 40 lb (18.14 kg) shall be installed to which of the following criteria?

 
 
 
 

NEW QUESTION 47
A fully sprinklered structure containing 1,500 sprinklers requires a minimum supply of how many spare sprinklers?

 
 
 
 

NEW QUESTION 48
Which of the following may initiate a fire alarm system?
I . A manual fire alarm
II . An automatic detector
III . An extinguishing system

 
 
 
 

NEW QUESTION 49
Which of the following is not the responsibility of the installing contractor when pursuing approval of sprinkler systems and private fire service mains?

 
 
 
 

NEW QUESTION 50
Which of the following operations would NOT require a permit issued by the AHJ?

 
 
 
 

NEW QUESTION 51
In a new assembly occupancy, what is the maximum aggregate area of acoustical and decorative materials used on floor and wall areas the AHJ may approve?

 
 
 
 

NEW QUESTION 52
Prior to seeking system acceptance for a sprinkler installation, an installer shall do which of the following?
I . Perform all required acceptance tests
II . Complete all contractors’ material and test certificates
III . Notify the AHJ of the time and date of the test
IV . Complete owners’ approval form and forward it to the AHJ

 
 
 
 

NEW QUESTION 53
Underground and exposed piping shall be flow tested to determine the internal condition of the piping at what minimal interval?

 
 
 
 

NEW QUESTION 54
The acceptance of a permit as defined in the fire code gives the authority having jurisdiction the right to enter the premises to inspect

 
 
 
 

NEW QUESTION 55
Egress capacity for stairs in high-hazard content areas is based on how many inches (millimeters) per person?

 
 
 
 

NEW QUESTION 56
Portable LP gas cooking equipment is allowed to be used in a restaurant when it complies with which of the following?

 
 
 
 

NEW QUESTION 57
What is the maximum travel distance from point A (fire extinguisher) to point B for the occupancy hazard associated with the floorplan?

 
 
 
 

NEW QUESTION 58
What is the maximum amount of Class IC flammable liquid permitted to be stored in the basement of a building?

 
 
 
 

NEW QUESTION 59
How often shall emergency egress and relocation drills in educational occupancies be conducted?

 
 
 
 

NEW QUESTION 60
The fire resistance rating of a separation extending 10 ft (3050 mm) from a set of stairs shall not be required to exceed 1 hour where openings have a minimum of what fire protection rating?

 
 
 
 

NFPA CFI-I Exam Syllabus Topics:

Topic Details
Topic 1
  • Occupancy Types: This section tests the abilities of exam-takers to assess fire and life safety systems for different occupancy types, including assembly, educational, and healthcare facilities.
Topic 2
  • Administration: This section of the exam measures the skills of Fire Inspectors and covers the preparation of inspection reports, identifying the need for permits, and recognizing when plan reviews are required. It also involves investigating complaints, identifying applicable codes, and participating in legal proceedings. One key skill measured is communicating findings clearly in written reports.
Topic 3
  • Fire Protection Systems & Equipment: This section evaluates the skills of Fire Safety Technicians and focuses on determining the operational readiness of fire suppression systems, alarm systems, and portable fire extinguishers.
Topic 4
  • Storage, Handling, & Use of Hazardous Substances and Materials: This module measures the skills of Fire Inspectors and includes recognizing hazardous conditions in equipment, processes, and operations.

 

CFI-I Dumps 100 Pass Guarantee With Latest Demo: https://www.dumpstests.com/CFI-I-latest-test-dumps.html

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw www.stes.tyc.edu.tw

No Responses

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

Related Certifications
Recent Comments